  • North Broad Street Safety Upgrade Project - Phase 2
    Project has commenced which includes the widening of SR 46 & 62 ( North Broad Street) from Skylione Drive north to Dartmouth Drive.  The project also includes curbing , storm drainage and street lighting.  the project construction cost is $ 850,000 of which 69 % was funded with a Grant from the Ohio Public Works Commission.
     
    Posted Sep 25, 2013, 8:06 AM by Dominic Rozzo
  • East Main Construction
    Paving has commenced along US224 and the Village Green.  this is part of a Safety Upgrade with includes the rehabilitation of US 224 from Talsman west to the Village Green and SR 46 & 62 around the Village Green by the replacement of Curb ramps, storm Drainage full depth pavement repair and milling and resurfacing.  the project construction  cost was  $ 1.1 million paid  for 100 % by grants from the Ohio Department of Transportation and the Eastgate Council of Government.
     
    Posted Sep 25, 2013, 8:03 AM by Dominic Rozzo
  • North Broad Safety Upgrade Updated Photos
    These photos were taken after the work on North Broad was completed.
     
          
     
     
     
    Posted Jul 18, 2012, 8:19 AM by Dominic Rozzo
  • North Broad Street Safety Upgrade Project Phase 1
     
    This safety upgrade project includes the lowering of a vertical curve obstruction between the Village Green and Brook park, and the inclusion of a dedicated right turn and left turn lane for southbound traffic approaching the village green. The project includes a dedicated right turn lane on Brook park and also a common turning lane at the intersection of Callahan, Brookpark, neff, and Skyline off North Broad. The Project will also include improved storm water drainage, sidewalks, and decorative lighting. The project limits of Phase 1 are from Skyline Drive south to the Village Green.
    the total Project Cost is $ 850,000 of which $714,000 was awarded to the City of Canfield in the form of a Grant from the Ohio Public Works Commission. The Local share comes from funding distributed to the City from the Motor Vehicle License fees and gas tax collected by the State of Ohio. ( see attached "before and construction photo's" )

     
    Posted Jul 18, 2012, 8:13 AM by Dominic Rozzo
Showing posts 1 - 4 of 4. View more »



Proposed Projects

  • Canfield Signalization Project

    Canfield Signalization Project (to be awarded in fall 2012)                         $ 400,000

    Project is funded 100% with Federal Congestion Management

    Air Quality (CMAQ) funding (project includes the replacement of the traffic signals and controllers at five (5) locations

    in the City with Radio frequency control and traffic monitoring devices.

    Posted May 11, 2012, 8:23 AM by Canfield Webmaster
  • Fairground Blvd. Hood Dr. Sidewalk Project

    Fairground Blvd. Hood Dr. Sidewalk Project (to be awarded in September 2012)                       $ 133,000

    Project is funded in part with Federal Enhancement Funds

    80% federal $166,250

    20% local    $33,250

    Posted May 11, 2012, 8:24 AM by Canfield Webmaster
  • Fairground Blvd. and Hood Drive Enhancement Project
    Project includes the placement of sidewalks along the south side of Fairground Blvd. from SR 46 to the Main entrance to the Fairgrounds, and along the Westside of Hood drive from Indian Lake Blvd. south to Fairground Blvd. Project is funded in part by a grant from the Ohio Department of Transportation covering 80% of the total project cost. Said project is slated to commence in late 2011. Estimated project cost $ 316,000 of which $ 252,800 (80%) is in the form of a ODOT Enhancement grant and $63,200 (20%) is the local share of the project.
    Posted Apr 17, 2012, 7:01 AM by Canfield Webmaster